Project Name

Construction on State Highway in Riverside County at and Near Romoland and Homeland from Bonnie Drive to Winchester Road



Bid/Contract #

Contract # 08-1C07U4



Awarding Agency

Department of Transportation



Project Location

Riverside, Riverside County, CA



Bid Date

06/26/2025 at 02:00



Project Details

: LEAD COMPLIANCE PLAN LEVEL 2 CRITICAL PATH METHOD SCHEDUL,TIME-RELATED OVERHEAD,DISPUTE RESOLUTION BOARD ON-SITE MEETING,HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS,DEVELOP WATER SUPPLY ,CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM,STATIONARY IMPACT ATTENUATOR VEHICLE,CHANNELIZER (SURFACE MOUNTED),PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM,TEMPORARY BARRIER SYSTEM,TEMPORARY PEDESTRIAN ACCESS ROUTE,PORTABLE CHANGEABLE MESSAGE SIGN,TEMPORARY CRASH CUSHION TL-3,JOB SITE MANAGEMENT,STORMWATER POLLUTION PREVENTION PLAN,STORMWATER ANNUAL REPORT,TEMPORARY SOIL BINDER,TEMPORARY FIBER ROLL,TEMPORARY CONCRETE WASHOUT,TREATED WOOD WASTE,CONTRACTOR-SUPPLIED BIOLOGIST,AERIALLY DEPOSITED LEAD SAMPLING, TESTING AND ANALYSIS (SURPLUS EXCAVATED MATERIALS),CLEARING AND GRUBBING,ROADWAY EXCAVATION,IMPORTED BORROW,ROCK BLANKET,MOVE-IN/MOVE-OUT (EROSION CONTROL),BONDED FIBER MATRIX (SQFT) SQFT,LEAN CONCRETE BASE,REPLACE ASPHALT CONCRETE SURFACING,HOT MIX ASPHALT (TYPE A),RUBBERIZED HOT MIX ASPHALT (GAP GRADED),PLACE HOT MIX ASPHALT DIKE (TYPE A),PLACE HOT MIX ASPHALT DIKE (TYPE C),PLACE HOT MIX ASPHALT DIKE (TYPE F),TACK COAT TON, REMOVE ASPHALT CONCRETE PAVEMENT,REMOVE ASPHALT CONCRETE DIKE,COLD PLANE ASPHALT CONCRETE PAVEMENT,JOINTED PLAIN CONCRETE PAVEMENT (RSC) ,DRILL AND BOND (DOWEL BAR),REMOVE CONCRETE PAVEMENT,GRIND EXISTING CONCRETE PAVEMENT,MINOR CONCRETE,DETECTABLE WARNING SURFACE,REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK),UNDERGROUND INFRASTRUCTURE DOCUMENTATION, INSTALL VAULT (TYPE 1),INSTALL VAULT (TYPE 2),INSTALL FIBER OPTIC CABLE 288 STRANDS (TYPE 1),TYPE 1 SPLICE ENCLOSURE, 288 STRANDS SPLICE CAPACITY,STRAND FIBER OPTIC CABLE,INSTALL MULTIDUCTS 24" DEPTH MICROTRENCH METHOD,HDPE MULTIDUCTS,INSTALL MULTIDUCTS HORIZONTAL DIRECTIONAL DRILLING METHOD,INSTALL SPLICE ENCLOSURE (TYPE 1),SPLICE FIBER OPTIC CABLE 288 STRANDS (TYPE 1),INSTALL OBJECT MARKER (TYPE K-2(CA),INSTALL FLEXIBLE POST DELINEATOR NON-REFLECTIVE CLASS 1,METALLIC DISK MARKER,INSTALL GROUND ROD IN VAULT,INSTALL METALLIC DISK MARKER,GUARD RAILING DELINEATOR,PAVEMENT MARKER RETROREFLECTIVE),MIDWEST GUARDRAIL SYSTEM (STEEL POST),MIDWEST GUARDRAIL SYSTEM (WOOD POST),MIDWEST GUARDRAIL SYSTEM (8' STEEL POST),VEGETATION CONTROL (MINOR CONCRETE) ,CONCRETE BARRIER (TYPE 60SD MODIFIED),TRANSITION RAILING (TYPE AGT),END ANCHOR ASSEMBLY (TYPE SFT-M),ALTERNATIVE IN-LINE TERMINAL TL-3,SEVERE-DUTY CRASH CUSHION TL-3,CONCRETE BARRIER (TYPE 60M),REMOVE GUARDRAIL,THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY),6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) ,8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY),6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 36-12),MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION,CAMERA SYSTEMS,FIBER OPTIC CABLE SYSTEMS,MODIFYING SIGNAL AND LIGHTING SYSTEMS ,MODIFYING TRAFFIC MONITORING STATIONS,MOBILIZATION