Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Patricia Nevin



Project Estimator

Bruce Link (516) 712-5019



Contact Information

1316 Motor Parkway
Islandia, NY 11749



Telephone

(631) 254-6767



Fax

(631) 254-8015



Stalco Construction, Inc.
is seeking qualified MBEs, WBEs, SDVOBss


Project Name

Dix Hills Water District - Wellhead Treatment for 1,4 Dioxane & Perchlorate at Plant No. 5



Bid/Contract #

DHWD 2025-03/O-EG: Contract G - General Construction



Awarding Agency

Town of Huntington



Project Location

Dix Hills, Suffolk County, NY



Bid Date

07/02/2025 at 12:00



Project Details

Stalco is submitting a bid to the Town of Huntington for the Dix Hills Water District - Wellhead Treatment for 1,4 Dioxane & Perchlorate at Plant No. 5 project and are seeking qualified NYS certified MBE, WBE, & SDVOB subcontractors to provide quotes.

Scope of Work Includes: Temporary Facilities and Controls; Temporary Electricity; Temporary Environmental Controls; Cleaning; Maintenance of Existing Conditions; Building Demolition; Asbestos Removal; Handling of Lead containing Materials; Removal and Disposal of Universal Waste and Fluorescent Lamps; Cast-in-Place Concrete; Brick Masonry; Concrete Unit Masonry; Structural Steel Framing; Steel Decking; Metal Fabrications; Rough Carpentry; Shop-Fabricated Wood Trusses; Finish Carpentry; Plastic Fabrications; Glass Fiber Reinforced Plastic Fabrications; Dampproofing; Water Repellants; Thermal Insulation; Air and Weather Barriers; Asphalt Shingles; Composite Metal Hybrid (CMH) Subframing Support System (SMARTC1 2 in 1); Fiber Reinforced Cementitious Panels; Flashing and Trim; Firestopping; Joint Sealants; Fiberglass Reinforced Plastic Doors & Frames; Aluminum Windows; Door Hardware; HVAC Louvers; Gypsum Board; Acoustical Panel Ceilings; Epoxy Fluid-Applied Flooring; Painting; Building Signage; Fire Extinguishers; General Mechanical Requirements; Mechanical Demolition; Mechanical System Identification; Balancing of Air Systems; Heating, Ventilating and Air Conditioning Sequence of Operations; Sheet Metal Work; Exhaust Fans; Diffusers, Registers and Grilles; HVAC Gravity Ventilators; Electric Heaters; Electrical Demolition; Site Clearing; Earth Moving; Rough Grading; Backfilling; Trenching; Excavation Support & Protection; Crushed Stone Aggregate Base Course; Asphalt Concrete Paving; Portland Cement Concrete Sidewalk; Portland Cement Concrete Curb; Site Bollards; Electronic Gate Operators; Chain-Link Cantilever Slide Gate; Topsoil Placement and Grading; Seeding; Planting; High Density Polyethylene Drainage Inlets; Storm Drainage Drywells; Pipe Penetration Seals.



If you wish to view the bid documents, please e-mail us back to get a sharefile link.




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.