Cassie Coppini
KODY KING
P.O. Box 1006
Eureka, CA 95502
(707) 443-6371
(707) 443-0277
INSTALL FIBER OPTIC CABLE SYSTEM, RAMP METERING, & WIDEN ROADWAY
04-1Q7214
CALTRANS
VARIOUS LOCATIONS, ALAMEDA, CONTRA COSTA & SOLANO COUNTIES County, CA
07/03/2025 at 02:00
LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TRAFFIC CONTROL SUPERVISOR, STATIONARY IMPACT ATTENUATOR VEHICLE, TYPE III BARRICADE, TEMP PAVEMENT MARKING, TEMP TRAFFIC STRIPE, CHANNELIZER, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, TEMP BARRIER SYSTEM, TEMP PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP CRASH CUSHION MODULE, TEMP CRASH CUSHION, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, STORMWATER (SAMPLING, ANALYSIS & REPORTING), TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE,TREATED WOOD WASTE, NOISE MONITORING, REMOVE CONCRETE, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, IMPORTED BORROW, WOOD MULCH, CHECK & TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL & NEUTRAL CONDUCTORS, REMOTE CONTROL VALVE, WYE STRAINER ASSEMBLY, CERTIFY EXISTING BACKFLOW PREVENTERS, GATE VALVE, PLASTIC PIPE, QUICK COUPLING VALVE, BALL VALVE, WELDED STEEL PIPE CONDUIT, MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST, INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE, ASPHALT TREATED PERMEABLE BASE, HIGH FRICTION SURFACE TREATMENT, REPLACE ASPHALT CONCRETE SURFACING, PRIME COAT, HOT MIX ASPHALT, GEOSYNTHETIC PAVEMENT INTERLAYER, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, TACK COAT, REMOVE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, SOIL NAIL, CAST-IN-DRILLED-HOLE CONCRETE PILE, STRUCTURE CONCRETE, ARCHITECTURAL TREATMENT, DRILL & BOND DOWEL, BAR REINFORCING STEEL, SCULPTED SHOTCRETE, STRUCTURAL SHOTCRETE, FURNISH & INSTALL SIGN STRUCTURE, REMOVE SIGN STRUCTURE WALKWAY, SOUND WALL, ACCESS GATE (SOUND WALL), REMOVE SOUND WALL, CONCRETE BACKFILL, TRASH NET, PLASTIC PIPE, REINFORCED CONCRETE PIPE, CORRUGATED STEEL PIPE, PLASTIC PIPE UNDERDRAIN, PLASTIC PIPE, SLOTTED PLASTIC PIPE UNDERDRAIN, GEOCOMPOSITE DRAIN, PIPE DOME, GRATED LINE DRAIN, INLET DEPRESSION, ABANDON CULVERT, REMOVE CULVERT, REMOVE INLET, ADJUST INLET, CAP INLET, ALTERNATIVE PIPELINER, CONCRETE, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION FABRIC, DETECTABLE WARNING SURFACE, MINOR CONCRETE, PRE/POST CONSTRUCTION SURVEYS, MISC IRON & STEEL, SIGNAL AND LIGHTING (CITY), MAINTAINING EXISTING ELECTRICAL SYSTEMS, PREP & STAIN SHOTCRETE, STAIN GALVANIZED SURFACES, CHAIN LINK GATE, REMOVE CHAIN LINK FENCE, RECONSTRUCT CHAIN LINK FENCE, REMOVE PAVEMENT MARKER, DELINEATOR, CONCRETE BARRIER DELINEATOR, GUARD RAILING DELINEATOR, PAVEMENT MARKER, TREATMENT BEST MANAGEMENT PRACTICE MARKER, OBJECT MARKER, REMOVE ROADSIDE SIGN, REMOVE SIGN PANEL, FURNISH LAMINATED PANEL SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN, METAL (BARRIER MOUNTED SIGN), ROADSIDE SIGN, INSTALL SIGN, INSTALL SIGN PANEL ON EXISTING FRAME, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, TRANSITION RAILING, END CAP, END ANCHOR ASSEMBLY, ALTERNATIVE CRASH CUSHION, ALTERNATIVE IN-LINE TERMINAL, ALTERNATIVE CRASH CUSHION, CONCRETE BARRIER, CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER, REMOVE CRASH CUSHION, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, TRAFFIC STRIPE TAPE, TRAFFIC STRIPE TAPE WITH CONTRAST, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MAINTAINING EXISTING FIBER OPTIC CABLE SYSTEMS AND ELECTRONIC TOLLING SYSTEMS DURING CONSTRUCTION, RAMP METERING SYSTEM, TRAFFIC MONITORING STATION SYSTEM, MODIFYING RECTANGULAR RAPID FLASHING BEACON SYSTEMS, CHANGEABLE MESSAGE SIGN SYSTEM, VARIABLE MESSAGE SIGN SYSTEM, CAMERA SYSTEMS, FIBER OPTIC CABLE SYSTEMS, MODIFYING FIBER OPTIC CABLE SYSTEMS, TEMP LIGHTING SYSTEMS, TEMP ELECTRONIC TOLLING SYSTEMS, MODIFYING CAMERA SYSTEMS, MODIFYING LIGHTING SYSTEMS, MODIFYING SIGNAL & LIGHTING SYSTEMS, MODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS, MODIFYING INTERCONNECTION CONDUIT & CABLE, MODIFYING TRAFFIC MONITORING STATION SYSTEMS, MODIFYING ELECTRONIC TOLLING SYSTEMS, POTHOLE UNDERGROUND UTILITIES, CONCRETE BARRIER
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.