Brenda Martinez
Thien Nguyen
1383 S Signal Dr
Pomona, CA 91766
(909) 622-2259 ext. 303
(909) 622-3053
Bayshore Bikeway Segment 5 and Connections
Project ID: 19-24
City of National City
National City, San Diego County, CA
07/22/2025 at 05:00
The general scope of work is the construction of a complete bikeway network, pedestrian improvements, and vehicle travel safety components, and supporting infrastructure improvements along four joined segments:
1. MARSH SEGMENT: consists of improvements along the Paradise Marsh, and on marina Way, starting at the connection with the existing Bayshore Bikeway at the southern limits of the project, traveling north to the intersection of Marina Way and Bay Marina Drive.
2. SEGMENT 5 SEGMENT: consists of improvements on Harrison Avenue north of the intersection of Marina Way and Bay Marina Drive, on 23rd Street between Harrison Avenue and McKinley Avenue, on McKinley Avenue between 23rd Street and 14th Street (except between 20th Street and 18th Street), under the I-5 southbound on-ramp, parallel to Harbor Drive between the intersection with Civic Center Drive and BNSF's right-of-way
3. RAILROAD SEGMENT: consists of improvements within BNSF's right-of-way near the crossing of the railroad tracks on Harbor Drive.
4. W 19th St SEGMENT: consists of the improvements on 19th Street and 18th Street between Wilson Avenue and McKinley Avenue, and on McKinley Avenue between 20th Street and 18th Street.
Subcontractor- AC Cold Grinding, AC Dike, Anti-Graffiti Coatings, Asphalt Paving, Clear and Grub, Electrical/ Comm, Guardrail/ Fencing, Hazardous Removal (Soil), Hydroseed, Job Coordinator, Landscaping, Minor Concrete, Minor Concrete Structures, Rail Road Signal, Reinforcing Steel, Retaining Wall, Sawcutting, Shotcrete, Signage and Striping, Slurry Seal, Soil Nail/Tieback, Street Sweeping, Traffic Control, Traffic Signal, Tree Removal, Trucking
Supplier- Aggregates, Asphalt, BMPs Materials, Boulders, CTB, Filterra Biorentention Units, RCP, Read Mix, Tensar/ Geotextile, Traffic Control Signs, Truncated Domes, Water Works
Estimated Project Value: $14M
DBE Goal: 20%
Assistance will be available in obtaining bonds, lines of credit,
insurance, necessary equipment, supplies,
materials or related technical assistance.
For information on the availability of scope of work, plans, and specifications, please contact our office.
Plans, Specifications, and Contract requirements can be viewed at no additional cost:
1) Via iSqFt - please send an email request to estimating@reyesconstruction.com
2) Via City of National City PlanetBids website: https://vendors.planetbids.com/portal/24103/bo/bo-detail/131386
3) In person at Reyes Construction Headquarters (please email for appointment)
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.