Cassie Coppini
Mark Benzinger
P.O. Box 1006
Eureka, CA 95502
(707) 443-6371
(707) 443-0277
WATER SYSTEM IMPROVEMENTS
EDWG-470004-001C
CITY OF ETNA
ETNA, SISKIYOU County, CA
08/13/2025 at 1:00
Construction Site Management, Earthwork, Site Improvements, Existing Facility Demolition, Reservoir Backwash Pond Conversion, Reservoir Drain/Overflow Realignment, Raw Water Piping & Connections, Backwash System Wetwell (Piping & Connections), Finished Water System (Pump, Piping & Connections), Filtered Water Site Piping & Connections, Finished Water Pipe & Connections, Steel Monument, Filter Building (Piping, Equipment, Filter Installation), Clarifier Filter Units, Instrumentation & Controls Equipment, Back-Up Generator System, Chainlink Fencing & Gates, Final WTP Set-Up & Operation Coordination, Mobilization
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail bids@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.