Ellie Cardona
Rick Eckels
1550 Park Ave
Emeryville, CA 94608
(415) 285-5000
(415) 285-5005
Main Wastewater Treatment Plant Digesters 7, 11, & 12 Rehabilitation
SD-450
East Bay Municipal Utility District
Oakland, Alameda County, CA
08/13/2025 at 11:00
Seeking all trades (but not limited to): Polyurethane foam roofing, Tank relining and epoxy coatings, Structural steel welding (critical connections), HVAC system installation (split units, ductwork), Testing, adjusting, and balancing HVAC, Fireproofing and insulation, Plumbing (drains, gas piping), Instrumentation & Controls, Digester flare ignitor system upgrade, Scaffold erection (if rented turn-key), Hazardous material testing/disposal, Roof access hatch demo & replacement, and other required work and trades.
Plans, specifications, and requirements can be viewed at our office or by using the link below.
https://construction-bids.ebmud.com/SpecMain.aspx?SpecGN=9388&BidMode=Current
Please review all documents. By submitting a proposal your company agrees to Anvil Builders Inc standard subcontract. For assistance with bonding, lines of credit, insurance, or anything else regarding bidding on this project, contact Anvil Builders via phone or email.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.