Sulaiman Jawandor
1750 New Highway
Farmingdale, NY 11735
(512) 297-2397
(631) 249-8124
Huebner Creek to Medical Center Trail and Park Phase 1 (Floyd Curl to Eckert)
23-04004
City of San Antonio
San Antonio, Bexar County, TX
08/01/2025 at 02:00
Huebner Creek is a 1.4-mile concrete trail, 6 to 10 feet wide, linking to Medical Center Park. It includes a pedestrian crossing at Babcock Road for better access and features paved pathways and ADA-compliant walkways. A trailhead at Babcock will have 39 parking spaces and amenities like a water fountain, shade structure, and restroom. The project ensures usability with good drainage and durable furnishings like benches and bike racks. Medical Center Park will cover 17 acres, offering recreational space, a modern playground with inclusive structures, and an overlook for relaxation.
This is a Re-Bid!!
Project plans and specs are available on the CivCast website:
https://www.civcastusa.com/project/6852e6c06b2133a6547da34e/summary
Participation goals for this project include MBE with a focus on African American Owned Businesses
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.