SILVER MOUNTAIN PUMP STATION UPGRADES
SAWS Job No. 22-6018 SAWS Solicitation No. CO-00824
San Antonio Water System
San Antonio, Bexar County, TX
07/31/2025 at 02:00
San Antonio Water System is working on the demolition of the existing pump station and associated equipment, as well as the construction and installation of a 550,000-gallon Type III prestressed concrete ground storage tank, a 3.0 MG booster station, a 15,000-gallon hydro-pneumatic tank, yard piping and valves, a control valve assembly, an electrical and I&C building, a pump station canopy, site grading and restoration, site fencing, electrical and instrumentation and controls (I&C) system upgrades related to the new facility, and miscellaneous civil site improvements, including fencing, lighting, and a new access driveway, for the Silver Mountain Pump Station Upgrades Project, SAWS Job No. 22-6018.
Project plans and specs are available on the CivCast website:
https://www.civcastusa.com/project/6843259137454df89ff25f6e/summary
Participation goals for this project are 17% HUB/SCTRCA under the SBOP program in San Antonio.