
Denise Hicks
310 West Park Avenue
Greenwood, MS 38930
(662) 453-2424
(662) 453-6783
Terminal Apron Expansion & Reconstruction (Stage 1)
--
Northwest Arkansas Regional Airport Authority
Bentonville, Benton County, AR
07/31/2025 at 02:00
The Project consists of a concrete apron expansion between Taxiways E and F, reconstruction of concrete pavement on Taxiway H and the existing Terminal Apron and improvements to the existing glycol facility. The scope of work generally includes removal of existing pavement, earthwork, construction of approximately 58,000 square yards of concrete pavement section and associated asphalt shoulders, installation of taxiway edge lights, installation of stormwater pipe and trench drains, installation of the underdrain system, installation of pavement markings, and site restoration as shown in the plans and indicated in the specifications.
https://qcpi.questcdn.com/cdn/posting/?group=83&provider=1960875&projType=all
Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.