Denia Lanza-Campos
Dan Hirsh
1995 Agua Mansa Road
Riverside, CA 92509
(951) 675-6137
(000) 000-0000
Mid County Parkway/Ramona Expressway Const. Contract 3
26-31-0005-00
Riverside County Transportation Commission (RCTC)
San Jacinto, Riverside County, CA
09/09/2025 at 02:00
Skanska USA Civil West California District Inc. is interested in soliciting in Good Faith all subcontractors and suppliers as well as CUCP certified DBE subcontractors and suppliers related to the scopes, AC Dike, Aggregates, Asphalt Paving, Bearing Pads, Biologist, BMP Materials, Bridge Deck Drainage System, CIDH, Clearing & Grubbing, Concrete Barrier (Bridge), Concrete Flatwork, Concrete Pump, Construction Area Signs, Erosion Control, Electrical, Fencing & Railing, Form liner, Geotextiles, Grind Existing, PCC, Guardrail, Hazardous Material Handling, Joint Seal Material, Landscape & Irrigation, Metal Decking, Milling, Minor Structures, Miscellaneous Metals, PCC Materials, PCC Paving, Pipe Materials, Photo & Video Survey, Post-Tensioned Concrete, Potholing, Pre/Post Construction Survey, Precast Girders, Quality Control, RCP Pipe, Ready Mix Concrete, Reinforcing Steel, Roadside Signs, Rock Slope Protection, Sign Structures, Steel Casing, Striping, Survey, Sweeper, Traffic Control, Timber Retaining Wall, Traffic Control Materials, Trucking, Water Truck.
DBE Goal 22%
BID DUE DATE: September 09, 2025 @ 2:00 PM (Skanska requests bids one (1) day prior to owner's due date.
Please submit your bids to Estimating: bids.socal@skanska.com
Plans, Specs and addendums are available for viewing at no cost through Skanska's electronic Plan Room BuildingConnected: https://app.buildingconnected.com/public/59b1c0096ab4570007e09292/projects/68921b6ca32b9d01ea2c6f85
Owners PlanetBids Website - https://www.planetbids.com/portal/portal.cfm?CompanyID=17920
General Work Description: The project in Riverside County involves a 8.6-mile re-alignment/widening of the existing Ramona Expressway located approximately 1 mile east of Rider Street extending eastward to Warren Road. The improvements will provide two lanes of traffic in each direction, add a raised median to separate eastbound and westbound lanes, add a Class II bicycle lane in each direction, build a bridge over the San Jacinto River, modify three existing signalized intersections, install one new signalized intersection, and construct a wildlife crossing.
Requirements: Skanska is an Equal Opportunity Employer and is requesting quotes from all qualified subcontractors and suppliers. Skanska will assist qualified subcontractors, vendors, & suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. If you are a DBE Company, please provide your certification letter with your proposal. In order to assist DBE subcontractors and suppliers, we will divide total requirements into smaller packages, tasks or quantities & establish delivery & construction schedule, which will permit maximum participation when feasible. If you are a Non-DBE, please indicate all lower-tier participation on your quotation as it will be evaluated with your price. Project documents can be reviewed by appointment in our office Monday through Friday, 7:00 am to 4:00 pm. Skanska's insurance requirements are Commercial General Liability (GL): $1M ea. occ., $1M personal injury, $2M products and completed operations agg. and general agg.; $1M Auto Liability; $5M Excess/Umbrella and $1M Workers Comp. Endorsements and waivers required are the Additional Insured End., Primary Wording End., and a Waiver of Subrogation (GL & WC). Other insurance requirements may be necessary per scope or RFP requirement. Subcontractors may be required to furnish performance & payment bonds in the full amount of their subcontract by an admitted surety & subject to approval by Skanska. Quotations must be valid for the same duration as specified by the Owner for contract award (180 days). Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. Skanska is signatory to the Operating Engineers, Laborers, Cement Masons, & Carpenters Unions. Subcontractors must provide weekly, one original and one copy of all certified payrolls, including non-performance and fringe benefit statements if required by law or by the Prime Contract. Please note that all Contractors and Subcontractors must register with The DIR (Department of Industrial Relations) in order to bid on public works projects. Include Contractor License Number and DIR Number on all Quotes Submitted. Skanska is an Equal Employment Opportunity (EEO) Employer. We do not discriminate on the basis of race, color, religion, sex, national origin, disability, age, genetic information, citizenship, protected veteran status, or any other categories protected under applicable federal, state, and local laws.
Estimating Department: 1995 Agua Mansa Rd, Riverside, CA 92509, Phone: (951) 684-5360 |
Lead Estimator: Dan Hirsh |Email: bids.socal@skanska.com
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.