Tania Munguia
411 Pendleton way Ste. B, Street Address 2
Oakland, CA 94621
(510) 577-7700
(510) 577-7706
Safe Routes to School Sidewalk Gap Closure - Phase 1
WT19013
City of Stockton
Stockton, San Joaquin County, CA
08/28/2025 at 02:00
Ray's Electric is requesting written quotations from qualified sub-contractors and vendors for the above-named project. GENERAL WORK DESCRIPTION: The project consists of install curb, gutter, sidewalk, high visibility crosswalks, Americans with Disabilities Act curb ramps, and traffic signal pedestrian upgrades. The project surrounding areas are four school side locations: 1) Jane Frederick High School, 2) Delta Sierra Middle School, 3) Victory Elementary, and 4) Montezuma Elementary as well as other work shown on the Plans and as called for in the Specifications and as directed by the Engineer.
The Construction shall conform City of Stockton Department of Public Works Standard Specifications and Plans current edition and the Department of Transportation of the State of California and Transportation Agency (CALTRANS) entitled Standard Specifications and Standard plans latest edition/California MUTCD latest Edition with latest Addendums and Revisions-Applies to Special Provisions.
This is a HUD Section 3 Project
The Plans and Specifications can be downloaded at https://www.stocktonca.gov/bid_detail_T22_R958.php or can be provide per request via email. If you have any question with regards to the scope of work, bonding, insurance requirements, please contact our office.
NOTE: Please send your quote with your DIR registration and Contractor License Number. Please have your quote in prior to 10:00 AM on August 28, 2025 to allow for review.
RAY'S ELECTRIC is an equal opportunity employer and a Union Signatory Contractor.
Should you have questions, please contact our estimating department. Thank you
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.