Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Audrey Schultz



Project Estimator

Dustin Hansen



Contact Information

41619 Margarita Road
Temecula, CA 92591



Telephone

(816) 741-4600



Fax

(816) 278-5912



Garney Companies, Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEss


Project Name

Sedco Hills Septic to Sewer Conversion - Package 1



Bid/Contract #

2317 - Package 1



Awarding Agency

Elsinore Valley Municipal Water District



Project Location

Windomar, Riverside County, CA



Bid Date

11/20/2025 at 02:00



Project Details

We are seeking quotes for the following scopes: Asphalt Paving 237310 // Aggregates 423320 // CCTV Video Inspection 238990 // Asphalt 423320 // Concrete Flatwork 238110 // Concrete R/M 423320 // Erosion Control 561730 // Equipment Rental 532411 // Landscaping 561730 // Erosion Control 423990// Potholing 238910 // Misc. Metals 238120 // Project Scheduler (CPM) 541611 // Pipeline Materials 423990 // Saw Cutting 561990 // Precast Concrete Structures 238120 // Street Sweeping 488490 // Traffic Control 423390 SWPPP 541620 // Traffic Control 561990 // Traffic Striping 237310 // Trucking 484220 // Video Recording of Existing Conditions 541611 // Water Truck 484220



Garney Pacific Inc. is looking for quotes for the below referenced project. Garney is a union contractor, all subcontractors on the project must utilize union labor. Garney requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse Subcontractors for the required bond premium, so please provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Garney Pacific unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions.

Garney Standard PO & Subcontract Forms: Standard Purchase Order and Subcontract documents can be downloaded via the link below. These documents will be used as the basis of contracting with Garney for the above referenced project. If you have any exceptions to these documents please send redlines and comments with your quote.

Bid Documents are available through our website at https://www.garney.com/upcoming-bids/




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.