Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Elizabeth Covall



Contact Information

1011 Warrenville Road
Lisle, IL 60532



Telephone

(630) 387-6027



Fax

(331) 777-5771



OHLA Central, Inc.
is seeking qualified MBEs, WBEs, SBA MBEs, VBEs


Project Name

Battery E Activated Sludge Facility, OWRP



Bid/Contract #

21-092-3P



Awarding Agency

MWRD



Project Location

Skokie, Cook County, IL



Bid Date

11/18/2025 at 11:00



Project Details

We are seeking quotes for MBE / WBE / VBE suppliers and subcontractors for the following scopes of work as according to the Metropolitan Water Reclamation Plant Divisions: Division 02 - Sitework including but not limited to: geotextiles, lead abatement, demolition, site clearing, tunneling & jacking, horizontal directional drilling, cast-in-place piles, erosion and sediment control, storm drainage utilities, concrete flatwork, landscaping. Division 03 - Concrete including but not limited to: Formwork, reinforcement, expansion joints, waterstops, cast-in-place, curing, precast structural concrete, grout, leakage testing of structures and concrete repair. Division 04 - Masonry. Division 05 - Metals including but not limited to: Structural steel, decking, metal fabrications, stairs, handrails, railings and floor grating. Division 06 - Wood and Plastics including but not limited to: Miscellaneous rough carpentry, fiberglass reinforced plastic grating, plank panel and structural shapes. Division 07 - Thermal and Moisture Protection including but not limited to: Board insulation, membrane roofing, stainless steel flashing & trim, scuppers & downspouts and firestopping. Division 08 - Doors & Windows including but not limited to: doors, frames, windows and hardware. Division 09 - Finishes including but not limited to: protective coatings. Division 10 - Specialties including but not limited to: Signage, washroom accessories and fire extinguishers. Division 11 - Equipment including but not limited to: Furnish & Installation of various pieces of equipment for mechanical scopes including, airlift pumps, slide gates, pumps and diffusers. Division 13 - Special Construction including but not limited to: I&C system general requirements, various control systems and laboratory equipment. Division 14 - Conveyance Equipment including but not limited to: trolley-hoist and monorail systems and portable cranes. Division 15 including but not limited to: Furnish and Installation of piping, valves, appurtenances, plumbing systems, HVAC systems, ductwork etc. Division 16 - Electrical including but not limited to: Furnish and installation of all electrical needs as shown in the project plans and specifications.



MPLA is in effect for this project. Plans and specifications available by request OR as shown on MWRDs site at the following URL: https://mwrd.app/Cntrctann/




Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.