
Karin Romeo
Bobby Alten
1141 Marina Way South
Richmond, CA 94804
(510) 234-4200 ext. 26
(510) 234-4221
West Valley College Performing Arts Center
BID #CA08-2526
West Valley Community College District
Saratoga, Santa Clara County, CA
11/20/2025 at 02:00
Scope: Demo of (E) Music Lab; partial demo of the (E) Theater (Drama Lab); construction of a new Music Building; construction of an addition to the (E) Theater; complete mandatory lateral systems rehabilitation and general alterations to the (E) Theater; Addition of fire sprinklers to the (E) Theater Building and Addition, as well as the new Music Building, Sitework including demo, hardscape, softscape/landscape and subgrade prep.
Note that this is an electronic upload bid, therefore all sub and supplier bids must be emailed or faxed to Alten Construction by 1:30 PM on bid day or risk not being used in our bid.
Project Labor Agreement (PLA) applied to this project / Please include the signed PLA Agreement to be Bound form with your bid along with your proof of CARB certification for diesel equipment
Prevailing Wage & Weekly Certified Payroll Reports on LCP Tracker
This project is subject to an OCIP that will cover:
• Workers Comp/Employers' Liability
• General Liability
• Excess/Umbrella Liability
• Builders Risk
• Pollution Liability
See SEWUP Manual provided with bid documents
Do not include the cost(s) for on-site insurance shown at left in your bids because they're covered by the OCIP. / Please DO include the cost(s) for on-site/off-site Auto in your bids as well as off-site labor/operations for all coverages shown at left in your bids.
5% Retention/ RFI Deadline is Wed 11/5/25 by 4PM to owner / There is no MEP or other subcontractor prequalification requirement noted in the Specifications / Duration Dates: Start 2/12/26 (660 Cal. Day Duration) / $5,000 per Calendar Day - Liquidated Damages SC and Punchlist & $500 per Calendar Day submittals per the Special Conditions.
Last Open House to see site is on 11/4/25 from 9-11AM
See PDF Entitled "CA08-2526 WV PAC - Formal CUPCCAA_ OCIP DVBE DSA PLA Covid Russia_FINAL" for Bid Alternates to include in your bid and other important informatoin.
1-Year General Warranty (refer to your spec section for other potential warranties)
New as of 1/1/24: SUBMIT CURRENT CARB CERTIFICATIONS WITH YOUR BID! New California Air Resource Board or C.A.R.B. requirements apply to all subcontractors with equipment on-site. Current certificates of compliance from the Air Resource Board's D.O.O.R.S. website and compliant equipment on-site will be required / monitored at all times by Alten staff.
Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
It is now State of CA law to include CSLB license # & DIR # on bid sub list - make sure to put them on your bid scope's 1st page!
Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which can requested from our bid coordinator Karin Romeo at kromeo@altenconstruction.com.
TRADES NEEDED (but not limited to): Surveying; HazMat Abatement; Demolition; Structure Demolition; Earthwork; Erosion Control; Site Drainage; Water Distribution; Sanitary Sewer; Asphalt Paving; Unit Pavers; Pavement Markings; Site Signage; Site Furnishings; Landscape & Irrigation; Fences and Gates; Site Concrete; Structural FRP Strengthening; Concrete Reinforcement; Bldg Concrete; Polished Concrete; Concrete Block; Structural & Misc Steel; Metal Decking; Decorative Metal Railings; Rough Carpentry; Stage Floor Construction; Finish Carpentry; Cabinets; Wood Paneling; Plastic Paneling; Composite Paneling; Waterproofing; Insulation; PVC Roofing; Metal Roofing; Metal Wall Panels; Sheet Metal Flashing; Vapor Barriers; Skylights; Joint Sealants; Doors, Frames & Hardware; Overhead Doors; Sound Control Doors; Storefront Systems; Curtain Wall Systems; Glass & Glazing; Cement Plaster; Gypsum Board and Metal Studs; Ceramic Tile; Acoustical Ceilings and Wall Treatments; Wood Flooring; Carpet & Resilient Flooring; Linear Metal Ceilings; Wood Grille Wall Panels; Sound Isolation Ceilings; Painting; Staining; High Performance Coatings; Marker & Tackboards; Toilet Accessories & Partitions; Fixed Glass Panel Partitions; Misc Specialties; Stage Curtain ;Pipe Grids; Motorized Utility Lift Pit; Orchestra Pit; Retractable Seating Platforms; Roller Window Shades; Performing Arts Casework; Entrance Floor Grilles; Upholstered Fixed Audience Seating; Site Furnishings; Elevator; Wheelchair Lift; Fire Sprinklers; Plumbing; HVAC; Electrical; and Communications.
Plans & Specifications are available for review and take-off in our office & free
download on BuildingConnected.
Estimator & BuildingConnected Plan Room Access: Bobby Alten x47
Bid Coordinator: Karin Romeo x26 / Chief Estimator: Erik Andresen x15
Phone: 1-510-234-4200 Email: bids@altenconstruction.com
Fax: (Dial 1 + Area Code even from a 510 number) 1-510-234-4221
In order for bids to be considered, they must be received at our office by email, mail, phone or fax one half hour prior to bid closing time.
INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED)
100% PERFORMANCE & PAYMENT SUB BONDS MAY BE REQUIRED.
ALTEN CONSTRUCTION WILL PAY UP TO 1.5% OF BOND PREMIUM.
PLEASE RESPOND TO EMAILED BUILDING CONNECTED INVITATION STATING WHETHER OR NOT YOU ARE BIDDING.
TO REQUEST ACCESS TO BUILDING CONNECTED (A FREE SERVICE), EMAIL bids@altenconstruction.com OR CALL (510) 234-4200 x47.
ALTEN CONSTRUCTION, LLC IS AN EQUAL OPPORTUNITY EMPLOYER
WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS
NOTICE: BY SUBMITTING A BID, BIDDING SUBCONTRACTOR, SUPPLIER OR VENDOR AGREE, WARRANTS AND UNDERSTANDS THAT:
A) ALTEN IS RELYING ON THAT BID FOR ITS BID TO OWNER, AND THE BID MAY NOT BE WITHDRAWN AFTER BID OPENING;
B) THAT BIDDER HAS REVIEWED THE PLANS AND SPECIFICATIONS, AND AS TO ITS SCOPE OF WORK, AGREES TO PERFORM ALL DUTIES INCLUDING INSURANCE AND INDEMNITY OBLIGATIONS, THAT ARE SPECIFIED BY OWNER AS ALTEN'S DUTIES, TO BIDDER'S DUTIES TO ALTEN; AND
C) THAT UPON ALTEN'S AWARD OF THE PRIME CONTRACT SUBCONTRACTOR WILL DULY AND TIMELY EXECUTE ALTEN'S FORM SUBCONTRACT AS TO THE BID SCOPE OF WORK IN THE BID.
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.