Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Shawna Garcia



Project Estimator

Ravi Agrawal



Contact Information

50 Contractors Street
Livermore, CA 94551



Telephone

(925) 245-2198



Fax

(925) 449-5875



Goodfellow Bros. California LLC
is seeking qualified SBEs, SBA VOBs, HUBZone, DVBEss


Project Name

Napa River / Napa Creek Flood Protection Project - Floodwalls North of the Bypass



Bid/Contract #

FC26-01



Awarding Agency

Napa County Flood Control and Water Conservation District



Project Location

Napa, Napa County, CA



Bid Date

01/09/2026 at 4:30



Project Details

We are seeking quotes for the following items: Survey & Staking, Clear & Grubbing, Quality Control & Testing, Silt Fence, Fiber Roll, Inlet Protection, Hydroseeding, Soil Amendment, Tree Removal & Trimming, Fence Removal, Demolition, Rip RAP Class V Material, Roadway Aggregate Material, Asphalt Concrete Material, Structural Concrete (Flood Walls), Minor Concrete, Precast Box Culverts, Underground Utility Work, Fence, Trucking, Arborist, Water Trucks, Pavement Striping and Markings, Temporary Traffic Control, Temporary Security Fence, Sheet Pile, Misc. Metal Fabrication & Installation, Security Cameras, Construction Message Signs, Construction Area Signs, Dewatering Wells, Sedimentation Tanks, Safety Railing, Traffic Signal Modification, Electrical, Jobsite Trailers, Street Sweepers.



The Napa River / Napa Creek Flood Protection Project - Floodwalls North of the Bypass, is a flood control project that provides riverine flood protection for the City of Napa. The project is managed by the Napa County Flood Control and Water Conservation District in cooperation with the US Army Corps of Engineers (USACE). The project is funded by Napa County Measure A (temporary sales tax, now ended) funds, Federal appropriations, and the State of California.
The total project proposes about 1.3 miles of floodwall including through public access using metal stop-log and swing gate openings. The project includes utility relocations, pipe penetrations through the floodwall, roadway and trail resurfacing, construction of a new public trail and flood control maintenance road, a new midblock pedestrian crossing at Lincoln Avenue, and other items as shown in the plans and described in the special provisions and standard specifications.

Link to the project site:

https://procurement.opengov.com/portal/countyofnapa/projects/200674

At our discretion, 100% Payment and Performance bonds may be required as a subcontract condition. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies for this project. Plans and Specs are available via Box link. GBI is willing to breakout any portion of work to encourage DBE (Hispanic Americans, Black Americans, Native Americans, Asian-Pacific Americans, Subcontinent Asian Americans and Women), SBE, HUBzone & VOB participation. If you require any assistance, please give Estimator Ravi Agrawal a call at 925-525-7947 and bids may be faxed to us at 925-449-5875. We are an equal opportunity employer.




Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.