
Mike Schalchi
850 South Van Ness Ave
San Francisco, CA 94110
(925) 324-2727
(800) 622-9144
Chinese Immersion School at De Avila Mitigation of Water Intrusion
12367
SFUSD
San Francisco, San Francisco County, CA
03/11/2026 at 11:00
NBC Construction & Engineering Inc. is requesting quotations on "ALL TRADES" from all qualified sub-contractors & suppliers, including quotes from DVBE/LBE/DBE/SBE/MBE/WBE firms, BEFORE 9 AM on 2/26/26.
Work is to include: Mitigation of water intrusion at existing exterior wall surfaces and windows involving selective site demolition, cement plaster and concrete wall repairs of cracks and spalls, replacement of existing wood windows with aluminum windows, sheet metal flashing, joint sealants, wall coating systems, interior wood trims and painting, ceiling repairs, and including abatement of hazardous materials. This project will be implemented in two phases. First Phase period shall be during May 1 to December 30, 2026. Second Phase period shall be during May 3 to August 30, 2027.
Please reach out with any questions regarding the obtaining of plans/specs or bonding requirements.
Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.