Cassie Holman
2244 Blach Place, Suite 100
San Jose, CA 95131
(408) 869-8324
(408) 244-2220
SBHSD- Hollister High School- Modernization Project
26-303
Blach Construction
Hollister, San Benito County, CA
03/25/2026 at 02:00
• Modernization of existing rooms in Bldgs. "F" and "G", including renovation of Drama Room and repurposing of Music Room to a Boardroom, Dance Classroom to a Flex Conference/Closed-Session Room, and Dining Room to a Bandroom.
• Modernization scope includes interior finishes, casework, mechanical/electrical/plumbing, technology, fire alarm, and required utility upgrades to support the scope.
• Exterior scope includes new custom steel entry canopy and new drinking fountain with bottle filler at Bldg. G South side, and new roof top packaged HVAC units.
The plans and specs are available for your review at our office. Bonds may not be required from qualified subcontractors. We are an equal opportunity employer.
Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.