Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Aniel Luna



Project Estimator

Matthew Cloud



Contact Information

75-77 Grove Street
Paterson, NJ 07503



Telephone

(973) 413-1912



Fax

(973) 684-1355



Railroad Construction Company Inc
is seeking qualified MBEs, WBEss


Project Name

Aqua New Jersey, Inc. - Hamilton Well 11C - PFAS Removal Treatment



Bid/Contract #

SCE-R13692.003



Awarding Agency

Aqua New Jersey, Inc.



Project Location

Hamilton Township, Mercer County, NJ



Bid Date

03/31/2026 at 12:00



Project Details

Project Name: Aqua New Jersey, Inc. - Hamilton Well 11C - PFAS Removal Treatment
Project Location: Hamilton Twp, NJ
Contract #: SCE-R13692.003
Duration: 1 year
Prevailing Wage: YES
Buy America: YES
PLA: NO
OCIP: NO
Current Bid Date: March 31, 2026 (3/31/26)
Participation Goal: 10% SED

See below for Project Description and Scopes we are looking for. Also, be sure to access the file/plan room to view project documents.

Scope of work (but not limited to): Water Treatment, Surveying, Instrumentation, Window, Utility, Trucking, QC & Lab Testing, Trucking & Disposal, Roofing, Rebar, Plumbing, Photography, Asphalt Paving, Overhead Door, Misc Metal, Mechanical Insulation, Mechanical, Masonry, Louver, HVAC, Gypsum Board, Fire Stopping, Excavation, Electrical, Door, CPM Scheduling, Structural Concrete, Carpentry & Drywall, Material Disposal Tipping Fees, Window Supply, Rebar Supply, Pumps, Misc Plumbing Supply, Pipe Valves, Process Pipe Supply, Pipe-Ductile Iron, Misc pipe, Precast Manhole & Catch Basin Supply, Misc Mechanical Supply, Misc Lumber Supply, Louver Supply, Instrumentation & Control, Equipment, Erosion Control Supply, Door Supply, Concrete Accessories, Concrete Ready Mix, CMU and Masonry Supply, Carpentry Supply, Bollard Supply, Asphalt Supply, Aggregate Supply

Project Description: Project includes the construction of a new 72' x 27.3' building for installation of IX treatment for PFAS removal. Treatment for PFAS removal consists of AdEdge Ion Exchange PFAS removal system and pre-treatment bag filter. The project also includes rebuilding of existing duplex booster pump and electrical upgrades as shown on the plans provided. The contractor is to furnish & install all improvements, complete in place. The existing water treatment equipment must remain in service throughout the entire project since there is no alternative water source. No modification to the chemical feed system is required.



LINK TO SOLICITATION DOCUMENTS: https://securecc.smartinsight.co/#/PublicBidProject/850207

ESTIMATING POINT OF CONTACT: BIDGROUP@RCCMAIL.NET (The bid goes in on our end Tuesday, Mar. 31st. Please submit your quote no later than Monday, Mar. 30th to the Bid Group email listed above)

RAILROAD CONSTRUCTION COMPANY, INC IS AN EQUAL OPPORTUNITY EMPLOYER




Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.