Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Tommi Compton



Contact Information

9818 Holton Way
Redding, CA 96003



Telephone

(530) 222-5048



Fax

(530) 222-5140



SnL Group, Inc.
is seeking qualified DVBEss


Project Name

Corning High School Culinary Arts Classroom Remodel



Bid/Contract #

NMR Project No. 25-2131



Awarding Agency

Corning Union High School District



Project Location

Corning, Tehama County, CA



Bid Date

05/05/2026 at 02:00



Project Details

SnL Group, Inc. is seeking quotes from Subcontractors, Vendors and Material Providers including all certified DVBEs for the following items of work, but not limited to: electrical, fire alarm system, mechanical and plumbing, aggregate materials, concrete, ADA compliance, metal building, framing, drywall, insulation, walls, floors, HVAC and painting.

The scope of work includes, but not limited to: CTE Shop remodel includes modernization of an existing high school shop building, replace electrical and fire alarm systems, upgrades mechanical & plumbing, minor site improvements for path of travel, equipment pads & fencing; Culinary Arts remodel includes modernization of an existing Home Ec classroom upgrade electrical & fire alarm, & new mechanical and plumbing systems and site for mech equ.



This project includes a 3% DVBE Participation Goal. "A DVBE cannot self-certify. Evidence of OSDS certification, which may include the printout from the OSDS website indicating current certification, must be provided for each DVBE participating in the contract. The OSDS certification letter or printout must be provided with the bid."

This projects is DSA approved project.

SnL is available to discuss breaking out any portion of work to encourage minority participation.

SnL Group, Inc.'s estimator can be reached at the office (530) 222-5048, and is available to provide you with any assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. SnL Group, Inc. may also assist in obtaining any necessary equipment, supplies, materials or related services.

Plans, specifications and project requirements may be reviewed at our office in Redding, CA. Additionally, contractor may request PDFs of the Contract Documents at no charge by emailing mia@nmrdesigns.com or contacting SnL directly.

Wage Requirements are Prevailing Wage for the State of California www.dir.ca.gov (https://www.dir.ca.gov/Public-works/Prevailing-
Wage.html). Each subcontractor must submit proof of current DIR Registration when submitting a quote.

Insurance Requirements: each subcontractor must submit proof of work comp insurance and obtain work comp throughout the completion of the project.

Requirements: by submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. SnL's written subcontract documents execution is required of all successful subcontract bids.




Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.