Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Alyssa Callaway



Contact Information

41619 Margarita Rd., Suite 200
Temecula, CA 92591



Telephone

(951) 795-4520



Fax

(000) 000-0000



Garney Pacific, Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, SDBs, WOSBss


Project Name

Valley View Water Consolidation Project



Bid/Contract #

SPECIFICATION NO. 2025-14



Awarding Agency

Coachella Valley Water District



Project Location

Thermal, Riverside County, CA



Bid Date

06/04/2026 at 02:00



Project Details

We are requesting quotes for the following types of work: 541330 : SWPPP/Erosion Control; 327992, 237310, 238990 : Aggregate Supply; 327390, 327331, 327332, 238120 : Precast Specialties; 237990, 238220 : Underground Piping; 541330 : Integration; 484110 : Trucking; 238990 : Shoring; 238390, 238320 : Painting/Coating; 332912, 332911, 332919 : Valve Supply; 238190, 335999 : Cathodic Protection; 327320, 327332 : Concrete Supply; 237990 : HDD; 561730 : Hydroseed/Landscape; 561990 : Traffic Control; 513199 : Scheduling; 238910, 238990 : Saw Cutting; 238990 : Fence/Gates; 332999 : Misc. Metals; 237310 : Asphalt Paving; 237310 : Striping; 334290, 238210 : Traffic Signals; 238910 : Jack & Bore; 541370 : Survey/Staking; 541922 : Photo/Video; 238110, 238190 : Concrete; 334512, 334513 : Settlement Monitoring

PROJECT DESCRIPTION: 1. The project consists of installing approximately 800 linear feet of 32-inch diameter fusible high density polyethylene (HDPE), 2,070 linear feet of 30-inch, 5,410 linear feet of 24-inch, 3,330 linear feet of 12-inch, 2,180 linear feet of 8-inch diameter water main pipe with restrained joints, including valves, fittings, polyethylene encasement, testing, disinfection, clearing and grubbing, excavation, imported sand, backfill and compaction of backfill, potholing all utility crossings, surface restoration and all necessary appurtenances complete and in place. The pipeline work also includes: excavation of jacking and receiving pits, shoring of trenches and pits as required, pipe jacking operations, horizontal directional drilling (HDD), and all related backfill and compaction. Portions of the pipeline will cross below ground the Union Pacific Railroad within a steel casing and the Coachella Valley Stormwater Channel (HDD) as indicated in the Contract Documents.

Desert View Trailer Park, Magdaleno Lopez, Campos MHP, Meza's Ranch, Valley View Trailer Park, Vista Norte Estates, Valenzuela Luciano, and Soto Water remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents.

Desert View Trailer Park, Magdaleno Lopez, Campos MHP, Meza's Ranch, Valley View Trailer Park, Vista Norte Estates, Valenzuela Luciano, and Soto Water remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents.

Furnish all labor, materials, and equipment necessary to perform and install street pavement and surface restoration as shown on the Drawings.

Apply and Obtain Encroachment Permit from the County of Riverside and Caltrans, including the preparation and implementation of Traffic Control Plans to be approved.

Prior to commencing work, Contractor shall notify Underground Service Alert (U.S.A., 811) of the proposed excavation. Contractor shall provide video documentation to CVWD of all existing condition, after marking utilities, for all the pre- and post-construction activities.
Other Details

Potential bidders must be able to comply with the Installation Floater/Builders Risk insurance requirements described in Section 5 of the General Conditions. The successful bidder shall provide Installation Floater Insurance, including Flood and Earthquake, for the full amount of the contract. The successful bidder has fifteen (15) days following receipt of the Notice of Award to provide insurance documents. The number of days beyond the original fifteen (15) days it takes to receive this will be deducted from the Contract Times.

The Engineer's Estimate of cost is $ 16,800,000.00. The total contract duration is 500 consecutive calendar days.



Bid Documents are available through our website at https://www.garney.com/upcoming-bids/. Please contact Alyssa Callaway at alyssa.callaway@garney.com with any questions.