Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Arie Harel



Project Estimator

Arie Harel



Contact Information

9915 Mira Mesa Blvd.
San Diego, CA 92131



Telephone

(858) 715-7200



Fax

(858) 715-7201



Walsh Construction
is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, SDBs, SBA SDVOBs, SBA VOBs, WOSBs, DVBEss


Project Name

Pure Water Antelope Valley Advanced Water Purification Facility



Bid/Contract #

Project ID: 22-654



Awarding Agency

Palmdale Water District (PWD)



Project Location

Palmdale, Los Angeles County, CA



Bid Date

07/17/2026 at 05:00



Project Details

WALSH CONSTRUCTION COMPANY II, LLC (WALSH) IS REQUESTING BIDS FROM ALL DBE/MBE/WBE/SBE/DVBE FIRMS IN ACCORDANCE WITH CLEAN WATER SWRCB/USEPA SRF, WIFIA FUNDING, AND DEPT. OF INTERIOR PGM
Walsh is proposing on the Progressive Design Build of the Pure Water Antelope Valley Advanced Purification Facility and related facilities. This anticipated project is a joint effort between the Palmdale Water District (PWD) and the Los Angeles County Sanitation Districts (LACSD). This project consists of constructing a new Advanced Water Treatment Facility (AWPF), product water pump station and pipeline, injection wells, tertiary water pump station and pipeline, brine pipeline, and brine ponds. Tertiary effluent from LACSD's Palmdale Water Reclamation Plant (WRP) will be used as feed water to PWD's AWPF, which will recharge the groundwater table for Indirect Potable Reuse (IPR).

At this time, Walsh is seeking proposals from DBE/SBE/MBE/WBE/DVBE firms to incorporate in our proposal, which will be submitted in response to PWD's Request for Proposals (RFP) for this project. We are soliciting proposals for the following services and are willing to discuss breaking out any portion of the work into economically feasible units to facilitate DBE participation: PRIMAVERA P6 SCHEDULING, LOCAL OUTREACH EFFORTS, CONCEPTUAL ESTIMATING FOR PIPELINE CONSTRUCTION, 3D MODELING, SITE UTILITY INVESTIGATION, DOCUMENT CONTROL, CONSTRUCTION PHOTOGRAPHY/VIDEOGRAPHY, PERMITTING ASSISTANCE, STORMWATER POLLUTION PREVENTION DEVELOPMENT, TRAFFIC CONTROL PLANS, CONSTRUCTION NOISE MANAGEMENT PLAN, TOPOGRAPHIC SURVEYING, GEOTECHNICAL INVESTIGATION

DBE/Minority/Female Goals (Good Faith Efforts), Dept. Of Interior EEO, Davis-Bacon Compliance, Union Labor, American Iron and Steel (AIS), Build America Buy America Act (BABA)
Proposals must be valid for 120 Days. Conditions or exceptions in Subcontractor's proposal are expressly rejected unless accepted in writing. Subcontractor proposals including any conditions or exceptions are required 1 week prior to the RFP submission deadline, which is July 24, 2026 at 5:00PM PST, to allow proper evaluation. For more information on this opportunity, please contact our office at (858) 715-7200 or socalwaterestimating@walshgroup.com. To assist DBEs, we will divide the total requirements into smaller tasks or quantities to facilitate maximum participation. EPA SRF and WIFIA forms are required with proposal submissions.

Walsh Construction Company II, LLC
Contact: Arie Harel
Phone: 858-715-7200
Bids shall be delivered to socalwaterestimating@walshgroup.com no later than 07/17/2026 at 5PM PST.
PLEASE SEND ALL CORRESPONDENCE, INCLUDING QUESTIONS AND QUOTES TO THIS EMAIL ADDRESS ONLY. WALSH CONSTRUCTION COMPANY II, LLC IS AN EQUAL OPPORTUNITY EMPLOYER AND STRONGLY SUPPORTS WORKFORCE DIVERSITY.



For more information on this opportunity, please contact our office at (858) 715-7200 or socalwaterestimating@walshgroup.com. If your company is interested in the project, please contact us before the bids due date of 07/17/26 to coordinate.




Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.