Deer Island Chemical Piping Replacement
MWRA Contract 6851
MWRA
Boston, Suffolk County, MA
08/05/2026 at 02:00
We are seeking quotes from MBE and WBE subcontractors.
The work includes, but is not limited to, replacement of all required underground and aboveground chemical piping between the Tank Farm and Disinfection Gallery at the Deer Island Wastewater Treatment Plant.
Drawings and Specifications can be viewed/downloaded via SmartBid