Michelle LaVanWay
Kevin Ellis
PO Box 604
Calimesa, CA 92320
(909) 797-7444 ext. 4
(909) 797-7755
Gumtree and Knoll Park Pipeline Replacement Project
Job #3274
Fallbrook Public Utility District
Fallbrook, San Diego County, CA
09/15/2026 at 02:00
Seeking certified/qualified DBE/MBE/WBE/SBE/SBRA/LSAF/HUB subs and suppliers quotes for, but not limited to, the following: SWPPP; traffic control plan; surveying; geotechnical compaction testing; preconstruction video; trucking; pipe welding; cold mill & asphalt overlay; traffic loops; and striping.
The work consists of installation of approx. 3,800 LF of 8" CML&C and 2,100 LF of 6" CML&C for the Knoll Park Phase and the Gum Tree Phase will replace approx. 3,000 LF of 20" CML&C pressurized potable water pipeline.
We are available to assist you with plans, specifications, bonding, or insurance requirements. To be considered as a potential subcontractor or supplier, please submit your quote and certification for review two days prior to the bid opening. Please note that additional forms or information may be requested. Downing is an Equal Opportunity Employer and we look forward to the opportunity to work together.
Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.