
Karin Romeo
Bobby Alten
1141 Marina Way South
Richmond, CA 94804
(510) 234-4200 ext. 26
(510) 234-4221
Stege Elementary School Campus Replacement Increment 2
--
West Contra Costa Unified School District
Richmond, Contra Costa County, CA
09/02/2026 at 02:00
Please note on your bid in BOLD if you are located in WCCUSD's Priority Area 1, 2 or 3.
Refer to WCCUSD Local Capacity Building Program provided on Building Connected.
The following are required to be included with your bid submission:
1. Breakout your quote per Building (A, B & C) and site costs.
2. Alternates may be required - see pending Bid Clarifications.
3. Provide a list of your fully burdened labor rates with your quote.
4. Please sign and return the PLA Agreement to be Bound and include with your bid.
5. Please provide a copy of your Air Resource Board CARB compliance form with your bid if you will use Diesel Equipment on site.
New as of 1/1/24: SUBMIT CURRENT CARB CERTIFICATIONS WITH YOUR BID! New California Air Resource Board or C.A.R.B. requirements apply to all subcontractors with equipment on-site. Current certificates of compliance from the Air Resource Board's D.O.O.R.S. website and compliant equipment on-site will be required / monitored at all times by Alten staff.
Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
It is now State of CA law to include CSLB license # & DIR # on bid sub list - make sure to put them on your bid scope's 1st page!
Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project, but you are required to include the cost for all required insurance in your bid on bid day.
Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which you can request from our bid coordinator Karin Romeo at bids@altenconstruction.com.
TRADES NEEDED (but not limited to):
Surveying; Earthwork; Erosion Control; Water Utilities; Sanitary Sewerage; Stormwater Conveyance; Asphalt Paving; Concrete Paving; Detectable Warning Pavers; Stabilized Crushed Aggregate Paving; Pavement Markings; Tactile Warning Surfacing; Synthetic Grass Surfacing; Playground poured-in-place Playground Surfacing; Playground Grass Resilient Surfacing; Chain link / Decorative Metal / Ornamental Metal Fences & Gates; Security Gates and Barriers; Planting & Irrigation; Under Slab Vapor Barriers; Concrete Reinforcing; Cast-in-Place Concrete; Sealed Concrete Finishing; Concrete Unit Masonry; Structural & Misc Steel; Metal Decking; Metal Fabrications; Metal Ladders; Rough & Finish Carpentry; Arch. Wood Casework; Fluid-Applied Waterproofing; Insulation; Weather Barriers; Pre-formed Roof Panels; Mod Bit Membrane Roofing; Sheet Metal Flashing & Trim; Roof Accessories; Penetration Firestopping; Joint Sealants; Doors, Frames & Hardware; Access Doors & Frames; Overhead Sectional Doors; Storefronts; Glazing; PC Plaster; Acrylic-Modified Cement Plaster; Gypsum Board; Tiling; Acoustical Panel Ceilings; Wood Strip & Plank Flooring; Resilient Flooring, base and Accessories; Fluid Applied Flooring; Carpeting; FRP; Tackable Wall Panels; Sound-Absorbing Wall & Ceiling Units; Painting & Coatings; Visual Display Boards; Signage; Electronic Marquee; Toilet Compartments; Folding Panel Partitions; Wall Protection; Restroom & Sink Accessories; Fire Protection Specialties; Coat & Backpack Hooks; Flagpoles; Food Service Equipment; Library Stack Systems; Projection Screens; Stage Curtains; Therapy Equipment; Window Shades; Solid Surfacing Countertops; Fire Suppression; Plumbing; HVAC; Electrical; Communications; and Electronic Safety & Security.
There is a Project Labor Agreement (PLA) on this project.
Prevailing Wage & Weekly Certified Payroll Reports on LCP Tracker
Skilled & Trained Workforce Requirements - Refer to requirements in the PLA.
See "Owner Contract Extracts for Sub Bids" folder for Insurance Requirements to Include in your bid
RFI Deadline is 8/24/26 by 5PM - but please send to us after deadline if needed
MEP+FS Subs MUST be prequalified with WCCUSD or submit Prequalification to District at least 2 weeks (or 10 business days) prior to bid (so by Wed 8/19/26).
Duration Dates: Oct 2026 to May 2028 - See Schedule in pending Bid Clarification
5% Retention / $1,000 per Calendar Day - Liquidated Damages - See Schedule for completion date(s)
Non-Mandatory / Highly Recommended Site Walk on 8/12/26 @ 10AM at the site - See pending Bid Clarification for details
Refer to "Owner Contract Extracts for Sub Bids" folder on Building Connected for additional bid documentation to account for in your bid
1-Year General Warranty (refer to your spec section for other, potentially longer warranties)
Plans & Specifications are available for review and take-off in our office & free download on BuildingConnected.
Estimator/Precon Manager & Building Connected Plan Room Access: Bobby Alten x47
Bid Coordinator: Karin Romeo x26 / Chief Estimator: Erik Andresen x15 / Estimator: Cameron Araghi x33 / Project PM: Jack Boynton (415) 916-6329
Phone: 1-510-234-4200 Email: bids@altenconstruction.com Fax: (Dial 1 + Area Code even from a 510 number) 1-510-234-4221
In order for bids to be considered, they must be received at our office by email, mail, phone or fax one half hour prior to bid closing time.
INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED)
100% PERFORMANCE & PAYMENT SUB BONDS MAY BE REQUIRED.
ALTEN CONSTRUCTION WILL PAY UP TO 1.5% OF BOND PREMIUM.
PLEASE RESPOND TO EMAILED BUILDING CONNECTED INVITATION STATING WHETHER OR NOT YOU ARE BIDDING.
TO REQUEST ACCESS TO BUILDING CONNECTED (A FREE SERVICE), EMAIL bids@altenconstruction.com OR CALL (510) 234-4200 x47.
ALTEN CONSTRUCTION, LLC IS AN EQUAL OPPORTUNITY EMPLOYER
WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS
Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.