Project Name

Water Line Replacement at Oakland and Santa Fe



Bid/Contract #

CIP 5661



Awarding Agency

City of Hemet



Project Location

Hemet, Riverside County, CA



Bid Date

09/21/2026 at 03:00



Project Details

The work generally consists of installing approximately 8,200 LF of 16-inch C900 PVC water main, including all associated fittings, valves, valve boxes, and appurtenances. Work includes installation of fire hydrants, blow-offs, air/vacuum release assemblies, service connections, and tie-ins to existing facilities. The Contractor shall perform all required trenching, excavation, bedding, backfill, compaction, material import/export, and thrust restraint installation, including thrust blocks and restrained joints. Work also includes restoration of all disturbed areas, including concrete, asphalt paving, aggregate base, and decorative crosswalk improvements.

Quotes Requested: Traffic Control, SWPPP, Utility Potholing, Survey & Staking, Asphalt Restoration, Striping, Concrete Restoration, Traffic Signals, Cathodic Protection, Fencing, Electrical & Instrumentation, Trucking/Hauling, Aggregate Supply, Pipe, Valve, & Appurtenance Supply, Ready-Mix Concrete Supply, Precast Concrete Supply

NAICS: 561990, 541330, 237310, 541370, 541360, 237310, 237310, 238390, 238190, 532490, 334290, 238190, 335999, 332618, 238990, 238210, 484220, 484122, 484110, 484121, 327992, 423320, 332911, 221310, 423840, 432510, 332996, 423830, 327332, 327320, 327390, 327331



Garney Pacific, Inc. is a union contractor and all subcontractors on the project must utilize union labor. Garney requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse subcontractors for the required bond premium, so please provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Garney, unless the project documents note otherwise. Please contact us for any insurance, bonding or other project-related questions.

Garney Standard PO & Subcontract Forms: Standard Purchase Order and Subcontract documents can be downloaded with the bid documents. These documents will be used as the basis of contracting with Garney for the above-mentioned project. If you have any exceptions to these documents, please send redlines and comments with your quote.

Garney Pacific, Inc. is an Equal Opportunity Employer and is available to assist where needed. We strongly encourage all DBE firms interested in this project to submit a competitive bid. Garney fully intends to meet or exceed the participation requirements for this project and is prepared to assist all subcontracting firms in achieving their highest quality of work while maintaining the industry's most competitive values.

Bid Documents are available through our website at https://www.garney.com/upcoming-bids/. Please contact Alyssa Callaway at alyssa.callaway@garney.com with any questions.

Garney Pacific, Inc. is signatory to Laborers & Operators unions.