
Wesley Zimmerer
4532 E. Jefferson Ave
Fresno, CA 93725
(559) 834-1551
(559) 834-5156
KCUSD Water Supply and Treatment Project for Alta, Riverview, and Kings Canyon High - Well Drilling Phase
1000316-001C
Kings Canyon Unified School District
Reedley, Parlier & Dinuba, Fresno County, CA
11/10/2026 at 14:00
Seeking DBE quotes: casing hammer test well (550 ft), e-log/caliper logging, video surveys, PVC and steel well casing, gravel pack, cement/seal materials, drilling fluids, project sign, cuttings/fluids hauling and disposal. All items open, including work Zim normally self-performs; Zim will break out work to aid DBE participation.
PLANS AND SPECIFICATIONS: Free download at https://www.kcusd.com/departments/purchasing-warehouse/bid-opportunities. Zim Industries, Inc. will email the portions applicable to your scope on request; contact Wes Zimmerer at (559) 834-1551.
BONDING AND INSURANCE: Zim Industries, Inc. does not require subcontractors to furnish bonds as a condition of quoting; where a bond is required for a scope, Zim will pay the premium. Zim will assist interested firms with bonding, insurance, lines of credit, and material supply, and will work with firms whose insurance limits fall short rather than exclude them.
LABOR COMPLIANCE: California prevailing wage and certified payroll; current DIR public works registration (Labor Code 1725.5). Proof of DBE certification must be current at bid opening.
Copyright © 2026, DBE GoodFaith, Inc. All rights reserved.